Ocala Metal Building Permit Guide
This metal building permit tips guide for Ocala will help answer critical permit questions and provide recommendations to avoid delays or disruptions caused by zoning and HOA requirements.
Planning and Zoning for Ocala, Florida
In order to determine If you can build a metal building in Ocala, Florida, it’s important to check with the planning and zoning department rules and requirements. These regulations outline what kinds of metal buildings are permitted, the structures intended use, and their placement on your property. They will include setback requirements, building height limits, and how the land is classified. Below are some planning and zoning resources in Marion County to get you started!
Address:
201 SE 3rd St
Ocala, FL 34601
Phone: (352) 629-8404
Am I allowed to build a Metal Building in Ocala, FL?
In order to determine If you can build a metal building in Ocala, Florida, it’s important to check with the planning and zoning department rules and requirements. These regulations outline what kinds of metal buildings are permitted, the structures intended use, and their placement on your property. They will include setback requirements, building height limits, and how the land is classified. Below are some planning and zoning resources in Marion County to get you started!
Address:
201 SE 3rd St
Ocala, FL 34601
Phone: (352) 629-8404
Check with Your Home Owners Association (HOA)
If your property falls within a Homeowners Association (HOA), investigate their rules before getting started. In many cases, HOAs set requirements that go beyond local regulations, covering things like approved materials, color choices, roof design, and even the size of the structure. It’s a good idea to get their approval early on to avoid delays or issues once construction is underway.
Ocala Metal Building Permit
Ocala permit requirements vary depending on whether the property is within Ocala city limits or unincorporated Marion County. Building permits are handled through the Ocala Growth Management Department or Marion County Building Safety depending on jurisdiction.
Do you need a permit for a metal building in Ocala, FL?
Yes. Permits are required for most structures unless you are certified Ag exempt. Permits are required for the following:
- Metal garages
- Workshops and storage buildings
- Commercial Metal Buildings
EVERSAFE BUILDINGS CAN ASSIST YOU WITH PULLING THE BUILDING PERMIT FOR YOUR METAL BUILDING
Some restrictions on what we do apply. Please contact us for more details.
When can I build without a permit?
Only when the property is certified as AG exempt land, a building permit is not required. This is not to be confused with having a residential-Ag classification for zoning which will still usually require a permit. Approval is based on having a productive approved agricultural business. Some examples are having bee hives, raising cattle, planting ornamental plants for sale or other crops like hay.
Starting construction without a permit can result in:
- Fines
- Stop-work orders
- Possible removal of the structure
How can I become Agricultural Exempt?
To get certified that you are in a productive agricultural activity or business on your property contact the main office at Marion County Property Appraiser- Westside Office. You will ask them for an agricultural classification, greenbelt application and the DR-482 Form.
Phone: (352) 368-8200
What documents are needed for a building permit in Ocala?
You typically need:
- Current Survey
- Site plan (shows building location on your property)
- Florida Stamped Engineered drawings
- Stormwater Management plan (typically only for larger projects)
- Drainage Plan
- Soil Density Report
- Foundation drawings and Anchoring Details
- Completed permit application
Where do you apply for a permit?
Permits are submitted through the Ocala Building Inspections within the city limits and the Marion County Building Safety Department in the unincorporated area, either online or in person.
Ocala Building Inspections:
Address:
201 SE 3rd St,Ocala,
FL 34471
Phone Number: (352)-629-8421
Office Hours: Monday–Friday 8:00 AM – 4:00 PM
Marion County Building Safety Department
Address:
2710 E. Silver Springs Blvd.,
Ocala, FL 34470
Phone Number: 352-438-2400
Office Hours: Monday–Friday 8:00 AM – 5:00 PM
What is the process for obtaining a permit in Ocala?
- Plan your building (size, type, location)
- Confirm zoning and setbacks
- Obtain engineered drawings
- Submit permit application
- Wait for approval
- Build the structure
- Complete required inspections
What inspections are required?
Most tubular metal building projects require:
- Form board/Foundation inspection
- Final inspection
All inspections must be passed before the building is approved.
Ocala Metal Building Tips:
How long does it take to a pull a permit in Ocala
A metal building project typically moves through several stages, including design, engineering, permitting, fabrication, and construction. The timeline can shift based on factors like, how customized the project is, how many revisions you make to your plans and the supplier’s schedule. Typical lead times vary by county but can range from a few weeks to up to 5 months based on revisions and or changes.
How can I Expedite the Metal Building Permit Process in Ocala, Fl?
Include all required documents and site plans, avoid revisions of engineered drawings, and surveys. Working with Eversafe metal buildings and our team of experienced professionals can help with the local process of permitting in Ocala.
Local Building Department information for Ocala