FREE DELIVERY & INSTALLATION NATIONWIDE

Bonita Springs Metal Building Permit Guide

This metal building permit tips guide for Bonita Springs will help answer critical permit questions and provide recommendations to avoid delays or disruptions caused by zoning and HOA requirements.

Planning and Zoning for Bonita Springs, Florida

In order to determine If you can build a metal building in Bonita Springs, Florida, it’s important to check with the planning and zoning department rules and requirements. These regulations outline what kinds of metal buildings are permitted, the structures intended use, and their placement on your property. They will include setback requirements, building height limits, and how the land is classified. Below are some planning and zoning resources in Lee County to get you started!

Address:
9101 Bonita Beach Rd SE,
Bonita Springs, FL 34601

Phone: (239) 444-6150

Am I allowed to build a Metal Building in Ocala, FL?

In order to determine If you can build a metal building in Ocala, Florida, it’s important to check with the planning and zoning department rules and requirements. These regulations outline what kinds of metal buildings are permitted, the structures intended use, and their placement on your property. They will include setback requirements, building height limits, and how the land is classified. Below are some planning and zoning resources in Marion County to get you started!

Address:
201 SE 3rd St
Ocala, FL 34601

Phone: (352) 629-8404

Check with Your Home Owners Association (HOA)

If your property falls within a Homeowners Association (HOA), investigate their rules before getting started. In many cases, HOAs set requirements that go beyond local regulations, covering things like approved materials, color choices, roof design, and even the size of the structure. It’s a good idea to get their approval early on to avoid delays or issues once construction is underway.

Bonita Springs Metal Building Permit

Bonita Springs permit requirements vary depending on whether the property is within Bonita Springs city limits or unincorporated Lee County. Building permits are handled through the Bonita Springs Community Development Department or Lee County Community Development depending on jurisdiction.

Do you need a permit for a metal building in Bonita Springs, FL?

Yes. Permits are required for most structures unless you are certified Ag exempt. Permits are required for the following:

  • Metal garages
  • Workshops and storage buildings
  • Commercial Metal Buildings

EVERSAFE BUILDINGS CAN ASSIST YOU WITH PULLING THE BUILDING PERMIT FOR YOUR METAL BUILDING

Some restrictions on what we do apply. Please contact us for more details.

When can I build without a permit?

Only when the property is certified as AG exempt land, a building permit is not required. This is not to be confused with having a residential-Ag classification for zoning which will still usually require a permit. Approval is based on having a productive approved agricultural business. Some examples are having bee hives, raising cattle, planting ornamental plants for sale or other crops like hay.

Starting construction without a permit can result in:

  • Fines
  • Stop-work orders
  • Possible removal of the structure

How can I become Agricultural Exempt?

To get certified that you are in a productive agricultural activity or business on your property contact the main office at Lee County Property Appraiser- Westside Office. You will ask them for an agricultural classification, greenbelt application and the DR-482 Form.

Phone: (239) 533-6100

What documents are needed for a building permit in Bonita Springs?

You typically need:

  • Current Survey
  • Site plan (shows building location on your property)
  • Florida Stamped Engineered drawings
  • Stormwater Management plan (typically only for larger projects)
  • Drainage Plan
  • Soil Density Report
  • Foundation drawings and Anchoring Details
  • Completed permit application

Where do you apply for a permit?

Permits are submitted through the Bonita Springs Community Development Department within the city limits and Lee County Community Development in the unincorporated area, either online or in person.

Bonita Springs Community Development Department:

Address:
9101 Bonita Beach Rd SE,
Bonita Springs, FL 34135

Phone Number: (239)-444-6150

Office Hours: Monday–Friday 8:00 AM – 4:00 PM

Lee County Community Development:

Address:
1500 Monroe St.,
Fort Myers, FL 33901

Phone Number: 239-533-8585

Office Hours: Monday–Friday 8:00 AM – 5:00 PM

What is the process for obtaining a permit in Bonita Springs?

  1. Plan your building (size, type, location)
  2. Confirm zoning and setbacks
  3. Obtain engineered drawings
  4. Submit permit application
  5. Wait for approval
  6. Build the structure
  7. Complete required inspections

 

What inspections are required?

Most tubular metal building projects require:

  1. Form board/Foundation inspection
  2. Final inspection

 

All inspections must be passed before the building is approved.

Bonita Springs Metal Building Tips:

How long does it take to a pull a permit in Bonita Springs

A metal building project typically moves through several stages, including design, engineering, permitting, fabrication, and construction. The timeline can shift based on factors like, how customized the project is, how many revisions you make to your plans and the supplier’s schedule. Typical lead times vary by county but can range from a few weeks to up to 5 months based on revisions and or changes.

How can I Expedite the Metal Building Permit Process in Bonita Springs, Fl?

Include all required documents and site plans, avoid revisions of engineered drawings, and surveys. Working with Eversafe metal buildings and our team of experienced professionals can help with the local process of permitting in Bonita Springs.

Local Building Department information for Bonita Springs

It’s a good idea to connect with the local building department early in the process to get a handle on their requirements, fees, and inspection steps. They can walk you through applicable codes, how to apply for permits, and what kind of timeline to expect. Having a direct contact there can also make it easier to get answers and keep things moving as your project progresses.
Drainage Management Plan
A drainage plan is often required and in larger building projects a storm water management plan might be needed. This is used to make sure drainage is handled properly and to reduce the risk of flooding or runoff problems. It usually details how water will be managed both during construction and after the project is finished, and in many cases, it needs to be approved before permits can be issued.
Survey
Make sure you have an up-to-date property survey before moving ahead. It shows your exact boundaries, any easements, and what’s already on the site. That information helps ensure the building is positioned correctly and meets setback rules. Having an accurate survey in place can also reduce the chance of disputes and make the permitting process go more smoothly.
Stamped Engineered Drawings
In most areas, you’ll need engineered drawings that carry a certified engineers stamp of approval before you can move forward with a metal building. A licensed engineer prepares and signs off on these plans to show the structure meets local code requirements and is designed to handle things like wind and load conditions. Getting these documents in place early can help speed up the permit approval process.  Some counties or cities will accept a manufacturers generic drawings and they usually have a very short lead time otherwise site specific or “as-built” drawings may be required detailing specific door and window locations.

Contact us for Assistance with your metal building